corner construct blank construction corner construct
qa/qc construct EN ISO 9000 QUALITY SYSTEM CONSTRUCTION OF CHEMICAL OIL/GAS AND PETROCHEMICAL/ POWER PROJECTS qa/qc construct
THE QUALITY LIVES ON LONG AFTER THE PRICE
spacer
ISO 9001:2000 QUALITY MANAGEMENT SYSTEMS IN THE FAST TRACK (EPC) ENGINEEER, PROCUREMENT & CONSTRUCTION PROJECTS
QUALITY PLANNING PREVENTS PATHETIC PERFORMANCE
qa/qc construct qa/qc construct qa/qc construct qa/qc construct qa/qc construct
Quality Assurance Quality Control www.qaqc-construction.com



Construction Photos
Upload free your Project Photos.




The Ozone Hole
Planet Earth 1999
Safeguard Our Environment
Use ISO 14001





Black oil is going green, use it carefully!

Greenpeace

CLICK for QA/QC Stickers

QA\QC stickers

CLICK for QA\QC Screensaver

QA\QC Screensaver

spacer
spacer spacer spacer
  Calibration (overview)  
  icon
Prepare Master List of Inspection, Measuring and Test Equipment
   
vrtline
  - equipment name/identification number
  - holder of equipment for recall purpose
  - frequency, criteria of acceptance, range of tolerance date of calibration
  - work instruction or procedure for calibration, to be in-house or external calibrated recall date.
vrtline
vrtline hzline
Ensure inspection, measuring, and test equipment is calibrated against Certified/Reference Equipment having a known valid relationship to Internationally or Nationality Recognized Standards.

Ensure Inspection, Measuring, and Test Equipment that is out of calibration is withdrawn from use.
vrtline
vrtline hzline
There are only nine types of inspection, and test measurement conducted to verify the performance of installations at commissioning or service.These are:
  - dead weight tester
  - temperature measurement
  - linear measurement
  - current rating of equipment
  - the resistance of a current carrying loop
  - the insulation resistance of a current carrying loop
  - electrical voltage measurement
  - water flow rates for hydrant systems
  - hydraulic pressure for pipe installation
spacer
vrtline
The calibration of any instrument will be considered invalid if any of the following situations occur.
vrtline
 
  - expiry any period as shown on the label
  - excessive electrical overload
  - tampering
  - excessive mechanical shock
vrtline
If an equipment is found to be out of calibration, the validity, and critically of previous recorded results must be assessed by the calibration controller, or his delegate. This assessment and any resulting actions must be documented.
cellspacer cellspacer cellspacer cellspacer cellspacer
 
spacer spacer spacer
© QA/QC Construction 2872643 pages requested
© Dr Mobeus Webscaping Monday 06 February 2012
American Express Visa Delta [1258 bytes] Visa [1251 bytes] MasterCard [1192 bytes]
corner construct blank construction corner construct

Oil And Gas The Project Overview QA\QC Systems Quality Services QA/QC Photo Gallery Library Tell Me A Story Design Variations Shop ISO9000

© 1998 - 2012 Copyright. All rights reserved