corner construct blank construction corner construct
qa/qc construct EN ISO 9000 QUALITY SYSTEM CONSTRUCTION OF CHEMICAL OIL/GAS AND PETROCHEMICAL/ POWER PROJECTS qa/qc construct
THE QUALITY LIVES ON LONG AFTER THE PRICE
spacer
ISO 9001:2000 QUALITY MANAGEMENT SYSTEMS IN THE FAST TRACK (EPC) ENGINEEER, PROCUREMENT & CONSTRUCTION PROJECTS
QUALITY PLANNING PREVENTS PATHETIC PERFORMANCE
qa/qc construct qa/qc construct qa/qc construct qa/qc construct qa/qc construct
Quality Assurance Quality Control www.qaqc-construction.com



Construction Photos
Upload free your Project Photos.




The Ozone Hole
Planet Earth 1999
Safeguard Our Environment
Use ISO 14001





Black oil is going green, use it carefully!

Greenpeace

CLICK for QA/QC Stickers

QA\QC stickers

CLICK for QA\QC Screensaver

QA\QC Screensaver

spacer
spacer spacer spacer
  Quality System Management ISO 9000 (1994)  
  icon
Product Manufacturing
1] Procedures & Specifications
2] Codes & Standards
3] ASME Certification
4] NDT Procedures
5] Inspection & Test Plans
6] Material Inspections
7] Pre Inspection Kick Off Meeting
Projects Needs for Quality Implementation
Mission Statement
Planning & Scheduling
Constructability Program
Audits
Training
Purchased Materials & Equipment Inspection Requirements
1] Overshort & Damage Report
2] nonconformance Report
3] Preventative Maintenance Schedules
4] Control Of Customer Supplied Product
Quality Management Savings
Virtually No Rework
Zero Punchlists
Project Completed Under
Budget And On Time
Company Annual Savings
Motivated Employees
Customer Satisfaction
   
4.1] Management Responsibility
4.2] Quality System
4.3] Contract Review
4.4] Design Control
4.5] Document & Data Control
4.6] Purchasing
4.7] Control Of Customer
indentSupplied Product
4.8] Product Identification
indent& Traceability
4.9] Process Control
4.10] Inspection & Testing
4.11] Control Of Inspection
indentMeasuring & Test Equipment




LEVEL 1
QUALITY
ASSURANCE
COMPANY POLICY
MANUAL


supplied to the customer
usually at bid stage


LEVEL 2
QA MANAGEMENT PROCEDURES

supplied by subcontractor unless otherwise agreed

LEVEL 3
QC INSPECTION PROCEDURES
NDE PROCEDURES
METHOD STATMENTS



LEVEL 4
QC INSPECTION CHECK SHEETS
4.12] Inspection & Test Status
4.13] Control Of Non-
indentConforming Product
4.14] Corrective &
indentPreventive Action
4.15] Handling Storage Packing
indentPreservation & Delivery
4.16] Control Of Quality
indentRecords
4.17] Internal Quality Audits
4.18] Training
4.19] Servicing
4.20] Statistical Techniques
   
 
spacer spacer spacer
© QA/QC Construction 1585488 pages requested
© Dr Mobeus Webscaping Friday 30 July 2010
American Express Visa Delta [1258 bytes] Visa [1251 bytes] MasterCard [1192 bytes]
corner construct blank construction corner construct

Oil And Gas The Project Overview QA\QC Systems Quality Services QA/QC Photo Gallery Library Tell Me A Story Design Variations Shop ISO9000

© 1998 - 2010 Copyright. All rights reserved