corner construct blank construction corner construct
qa/qc construct EN ISO 9000 QUALITY SYSTEM CONSTRUCTION OF CHEMICAL OIL/GAS AND PETROCHEMICAL/ POWER PROJECTS qa/qc construct
THE QUALITY LIVES ON LONG AFTER THE PRICE
spacer
ISO 9001:2000 QUALITY MANAGEMENT SYSTEMS IN THE FAST TRACK (EPC) ENGINEEER, PROCUREMENT & CONSTRUCTION PROJECTS
QUALITY PLANNING PREVENTS PATHETIC PERFORMANCE
qa/qc construct qa/qc construct qa/qc construct qa/qc construct qa/qc construct
Quality Assurance Quality Control www.qaqc-construction.com



Construction Photos
Upload free your Project Photos.




The Ozone Hole
Planet Earth 1999
Safeguard Our Environment
Use ISO 14001





Black oil is going green, use it carefully!

Greenpeace

CLICK for QA/QC Stickers

QA\QC stickers

CLICK for QA\QC Screensaver

QA\QC Screensaver

spacer
spacer spacer spacer
  Project Quality Awareness  
 
Play the Quality System Management Game
Is your attention span limited and you are having difficulty concentrating at the weekly Project QA/QC Meetings?
Here is a way to change all that!

How To Play:
Tick-off each block, when you hear these words during a QA/QC meeting. When you get five blocks horizontally, vertically, or diagonally, stand up and shout
(Get it Right First Time Every Time)

Fit for Purpose!Audit ScheduleQuality ImprovementCorrective Action RequestQC Inspector
Cut it OutQuality AuditTeam PlayerGet it Right First Time Every TimeQuality Management Systems
ISO 9000:2000Nonconformance ReportsQuality EnvironmentCustomer OrientedFast Track
Top Management SupportQuality ResourcesTotal Quality Management (TQM)Product RealizationQuality Planning
QA/QC ProceduresQuality FocusedQA/QC Organization ChartUser FriendlyInspection & Test Plan

Testimonials From Satisfied Players:


"I had only been in the meeting for five minutes when I won."
-Jack W. -Bolton UK, (QC Senior Welding Inspector).
"My attention span at meetings has improved dramatically."
-Mohammed-K- Kabul, (QC Coating Inspector).
"What a gas. Meetings will never be the same for me after my first win."
-. Sarjono- Indonesia (QC Piping Inspector).
"The atmosphere was tense during the last Quality Management Meeting as 14 of us waited for the 5th box."
-Tommy .M -Philippines,(QC Mechanical Inspector).
"The meeting chairman was stunned as eight Project QC Inspectors screamed ‘(Get It Right First Time Every Time)’ for the third time in 2 hours."
-L Kim.Korea (Mechanical QC Inspector).
Post Meeting Note:
The quality-meeting chairman thanked the meeting members for their supportive participation and stated a quality audit will be conducted to ensure that the Project Quality Management System was fully implemented and effective. The meeting chairman instructed all members of the meeting to make them selves available for the audit and not to go on vacation, or have urgent inspections on site. The meeting chairman stated that no further sick notes will be accepted for these QC inspectors that have previously submitted sick notes for reoccurring industrial depression.

 
spacer spacer spacer
© QA/QC Construction 2872512 pages requested
© Dr Mobeus Webscaping Monday 06 February 2012
American Express Visa Delta [1258 bytes] Visa [1251 bytes] MasterCard [1192 bytes]
corner construct blank construction corner construct

Oil And Gas The Project Overview QA\QC Systems Quality Services QA/QC Photo Gallery Library Tell Me A Story Design Variations Shop ISO9000

© 1998 - 2012 Copyright. All rights reserved