corner construct blank construction corner construct
qa/qc construct EN ISO 9000 QUALITY SYSTEM CONSTRUCTION OF CHEMICAL OIL/GAS AND PETROCHEMICAL/ POWER PROJECTS qa/qc construct
THE QUALITY LIVES ON LONG AFTER THE PRICE
spacer
ISO 9001:2000 QUALITY MANAGEMENT SYSTEMS IN THE FAST TRACK (EPC) ENGINEEER, PROCUREMENT & CONSTRUCTION PROJECTS
QUALITY PLANNING PREVENTS PATHETIC PERFORMANCE
qa/qc construct qa/qc construct qa/qc construct qa/qc construct qa/qc construct
Quality Assurance Quality Control www.qaqc-construction.com

hereYou are not logged in.

Premium Login   
Username :
Password :
 


Construction Photos
Upload free your Project Photos.




The Ozone Hole
Planet Earth 1999
Safeguard Our Environment
Use ISO 14001





Black oil is going green, use it carefully!

Greenpeace

CLICK for QA/QC Stickers

QA\QC stickers

CLICK for QA\QC Screensaver

QA\QC Screensaver

spacer
spacer spacer spacer
  Hydrotest Failure  
 
Pressure Vessel Failure during Hydrotest-Nov. 2007 in China
January 9, 2008
Thomas Eun

Folks,
Please find attached photos of a pressure vessel that recently failed whilst under hydrotest during post fabrication testing. This vessel was manufactured by a vessel vendor in China and the plate was of Chinese mill origin. Unfortunately this is another example of serious equipment/material failures with equipment being sourced out of the rapidly developing economies such as China, Eastern Bloc and others. These examples are becoming almost a weekly occurrence now and are exhibiting failure modes not seen in the mature manufacturing economies since the 1930's. Again we need to ensure vigilance in the acceptance of manufacturers and once more I stress the need to know where the base materials are sourced from.

Apparently this pressure vessel had reached fifty percent of the required test pressure when the shell ruptured. A metallurgical failure report is not available however from the photographs a number of observations could be made regarding the quality of the material and the welding.

Lesson learned
(1) All base metal requirements shall be specified in P.O Requisition per project/Industry Code requirements.
(2) Consult specialists (i.e., Materials and Corrosion Engineers) whenever you doubt.
(3) All inspection (from base materials to final products) should be performed per the codes, specs & standards.
(4) Especially when you selected the manufacturers in China, the above (1), (2) & (3) will be a very important message.


please click on the image to see the next slide.

Download This file here and view using ADOBE PDF Reader - Acrobat

 
spacer spacer spacer
© QA/QC Construction 1293108 pages requested
© Dr Mobeus Webscaping Thursday 11 March 2010
American Express Visa Delta [1258 bytes] Visa [1251 bytes] MasterCard [1192 bytes]
corner construct blank construction corner construct

Oil And Gas The Project Overview QA\QC Systems Quality Services QA/QC Photo Gallery Library Tell Me A Story Design Variations Shop ISO9000

© 1998 - 2010 Copyright. All rights reserved