qa/qc construct EN ISO 9000 QUALITY SYSTEM CONSTRUCTION OF CHEMICAL OIL/GAS AND PETROCHEMICAL/ POWER PROJECTS qa/qc construct
THE QUALITY LIVES ON LONG AFTER THE PRICE
spacer
ISO 9001:2000 QUALITY MANAGEMENT SYSTEMS IN THE FAST TRACK (EPC) ENGINEEER, PROCUREMENT & CONSTRUCTION PROJECTS
QUALITY PLANNING PREVENTS PATHETIC PERFORMANCE
qa/qc construct qa/qc construct qa/qc construct qa/qc construct qa/qc construct
Quality Assurance Quality Control www.qaqc-construction.com



Construction Photos
Upload free your Project Photos.




The Ozone Hole
Planet Earth 1999
Safeguard Our Environment
Use ISO 14001





Black oil is going green, use it carefully!

Greenpeace

CLICK for QA/QC Stickers

QA\QC stickers

CLICK for QA\QC Screensaver

QA\QC Screensaver

spacer
spacer spacer spacer
  PROJECT (QC PROCEDURES TEMPLATE)  
 
Payment can be made by secure server then emailed to
your computer with payment statement
Try out our demo download and see what you get and how you receive it. DOWNLOAD
All checksheets/procedures in A4 Page format.

204 - QC PIPING PROCEDURES
200 - QC CIVIL- PROCEDURES
201 - QC BUILDING PROCEDURES
202 - QC STRUCTURAL PROCEDURES
203 - QC COATING PROCEDURES
205 - QC INSULATION PROCEDUES
206 - QC ELECTRICAL PROCEDURES
207 - QC INSTRUMENTATION PROCEDURES
208 - QC WELDING PROCEDURES
209 - QC MECHANICAL PROCEDURES
210 - QC ROTATING EQUIPMENT
280 - ALL Project Procedures
Select a category of inspection sheet:

204 - QC PIPING PROCEDURES

  • PIPING DEMOLITION
  • BOLTING
  • DISINFECTION PORTABLE WATER
  • PIPING FABRICATION
  • PIPING INSTALLATION
  • PRESSURE PIPE TESTING
  • HOT - TAPS
  • TIE - INS
  • FLUSHING
  • BLINDING OF PIPING EQUIPMENT
  • SOCKET SPACER INSERTS
  • SOLVENT JOINTING PVC PIPE



    INSPECT
    200 - QC CIVIL- PROCEDURES

  • SURVAYING
  • SITE HANDLING - CIVIL MATERIALS
  • CIVIL DEMOLITION
  • DISPOSAL OF WASTE MATERIAL
  • EXCAVATION
  • DEWATERING
  • BACK FILLING
  • FORMWORKS
  • CONCRETE REINFORCEMENT
  • CONCRETE POURING
  • CONCRETE COURING
  • GROUTING
  • CONCRETE REPAIR
  • ASPHALTING



    INSPECT
    201 - QC BUILDING PROCEDURES

  • CONCRETE FLOOR CONSTRUCTION
  • BUILDING & MASONARY WALL
  • DRY WALL INSTALLATION
  • BUILDING ROOF INSTALLATION
  • BUILDING CELILING INSTALLATION
  • PRECAST BUILDING INSTALLATION
  • DOORS & WINDOWS INSTALLATION
  • BUILDING INSULATION
  • WATER PROOFING
  • WALL & FLOOR FINISHES
  • RAISED FLOOR INSTALLATION



    INSPECT
    202 - QC STRUCTURAL PROCEDURES

  • SITE HANDLING STRUCTURAL
  • STRUCTURAL INSTALLATION
  • STRUCTURAL FABRICATION
  • STRUCTURAL DEMOLITION



    INSPECT
    203 - QC COATING PROCEDURES

  • COATING
  • COATING MATERIAL



    INSPECT
    205 - QC INSULATION PROCEDUES

  • SURFACE PREP INSULATION
  • APPLICATION OF INSULATION
  • CLADDING
  • HEAT SLEEVE PIPE
  • TAPE WRAPPING PIPING
  • CONCRETE FIRE PROOFING
  • REFRACTORY



    INSPECT
    206 - QC ELECTRICAL PROCEDURES

  • CONDUIT INSTALLATION
  • DEMOLITION OF ELECTICAL EQIPMENT
  • STORAGE HANDLING ELECTRICAL
  • CABLE TRAY INSTALLATION
  • CATHODIC PROTECTION
  • CABLE PULLING
  • GROUNDING SYSTEMS
  • DUCTBANK INSTALLATION
  • ELECTRONIC MOTOR
  • GENERATOR INSTALLATION
  • SWITCH GEAR INSTALLATION
  • TRANSFORMER INSTALLATION
  • BATTERY UPS
  • JUNCTION BOX INSTALLATION
  • MOTOR CONTROL
  • LIGHTING SYSTEM
  • CONTROL PANEL
  • RELAY INSTALLATION
  • BREAKER INSTALLATION
  • CABLE TESTING
  • GROUNDING SYSTEMS
  • MOTOR TESTING
  • SWITCHGEAR TESTING
  • TRANSFORMER TESTING
  • BATTERY TESTING
  • CONDUIT SEAL POURING
  • MULTIWAY SWITCH
  • TERMINATION SPLICING
  • IN PLANT COMMUNICATION
  • TERMINATION & SPLICING



    INSPECT
    207 - QC INSTRUMENTATION PROCEDURES

  • SITE HANDLING INSTRUMENT
  • DEMOLITION OR INSTRUMENTS
  • INSTRUMENT PREINSTALLATION CALIBRATION
  • INSTALLATION - TRANSMITTER
  • INSTALLATION - CONTROL VALVE
  • INSTALLATION - SWITCHES
  • INSTALLATION SAFETY VALVES
  • INSTALLATION - ANALYZERS
  • INSTALLATION - INDICATORS
  • INSTALLATION - MISCELLANEOUS INSTR.
  • FIELD PRESSURE TEST INSTUMENT PIPE
  • INSTRUMENT LOOP CHECK
  • FIRE ALARM
  • GAS DETECTION



    INSPECT
    208 - QC WELDING PROCEDURES

  • SITE WELDING
  • PREHEAT & INTERPASS HEAT
  • HEAT TREATMENT
  • POST WELD HEAT TREATMENT



    INSPECT
    209 - QC MECHANICAL PROCEDURES

  • PRE-INSTALLTION MECH EQUIPMENT
  • PROTECTION PRESERVATION & MAINT OF EQUIPMENT
  • COLD CUTTING & PREPERATION FOR HOT WORK
  • SCAFFOLDING
  • CAR SEALING
  • RIGGING
  • PRESERVATION OF EQUIPMENT
  • HANDLING & IDENTIFICATION MECH MATERIALS
  • INSTALLATION OF MECHANICALEQUIPMENT
  • TUBE ROLLING



    INSPECT
    210 - QC ROTATING EQUIPMENT

  • PREPARATION OF ROTATING EQUIPMENT
  • ROTATING EQUIPMENT ALIGNMENT



    INSPECT
    280 - ALL Project Procedures

  • All Project Procedures



    INSPECT
     
    spacer spacer spacer
    © QA/QC Construction 1651419 pages requested
    © Dr Mobeus Webscaping Sunday 05 September 2010
    American Express Visa Delta [1258 bytes] Visa [1251 bytes] MasterCard [1192 bytes]
    corner construct blank construction corner construct

    Oil And Gas The Project Overview QA\QC Systems Quality Services QA/QC Photo Gallery Library Tell Me A Story Design Variations Shop ISO9000