qa/qc construct EN ISO 9000 QUALITY SYSTEM CONSTRUCTION OF CHEMICAL OIL/GAS AND PETROCHEMICAL/ POWER PROJECTS qa/qc construct
THE QUALITY LIVES ON LONG AFTER THE PRICE
spacer
ISO 9001:2000 QUALITY MANAGEMENT SYSTEMS IN THE FAST TRACK (EPC) ENGINEEER, PROCUREMENT & CONSTRUCTION PROJECTS
QUALITY PLANNING PREVENTS PATHETIC PERFORMANCE
qa/qc construct qa/qc construct qa/qc construct qa/qc construct qa/qc construct
Quality Assurance Quality Control www.qaqc-construction.com

hereYou are not logged in.

Premium Login   
Username :
Password :
 


Construction Photos
Upload free your Project Photos.




The Ozone Hole
Planet Earth 1999
Safeguard Our Environment
Use ISO 14001





Black oil is going green, use it carefully!

Greenpeace

CLICK for QA/QC Stickers

QA\QC stickers

CLICK for QA\QC Screensaver

QA\QC Screensaver

spacer
spacer spacer spacer
  In Process Inspection  
 
Closure of nonconformance Reports
horiline spacer Issued nonconformance reports can be generated form the customer or to the supplier or vendor. It is important the control and action for closure purposes is coordinated through a sole point of contact.Ensuring that delays in the construction schedule are kept to an absolute minimum.
vertline
Client Sign off of Inspection Test Dossiers
horiline It must be agreed with the customer if they are going to sign off the inspection check sheets during their attendance at the place of inspection or whether the customer will verify conformance by reviewing the As-Built Turn Over Dossiers.If this is not agreed at the early stage of the project this could cause considerable delay later on.
vertline
Punch-snag List Items
horiline Prior to the completion of a Project Milestone all outstanding items should be identified through one point of source. Punchlisted items should be agreed and coordinated with the customer prior to final handover.
vertline
Outstanding Work list Defined
horiline Out standing work lists that are identified in the Punch list that cannot be completed must be identified in a Project Exception List, rework to be completed at a later time. All rework must be agreed with the customer.
vertline
QA/QC Documentation Reconciliation
horiline Copies of Project Quality Control and Quality Assurance documentation are normally required by contract to be held for retention for a period of five years by the suppliers or Prime Contractor. Where a component or section of the Project fails at a later stage a warranty claim will be initiated by the customer.
vertline
QC Manpower Defined
horiline The Customer and the Prime Contractors must ensure there is sufficient Quality Control manpower on resources for the scope of the customer's Technical Specifications.
spacer      
 
spacer spacer spacer
© QA/QC Construction 1293094 pages requested
© Dr Mobeus Webscaping Thursday 11 March 2010
American Express Visa Delta [1258 bytes] Visa [1251 bytes] MasterCard [1192 bytes]
corner construct blank construction corner construct

Oil And Gas The Project Overview QA\QC Systems Quality Services QA/QC Photo Gallery Library Tell Me A Story Design Variations Shop ISO9000

© 1998 - 2010 Copyright. All rights reserved