corner construct blank construction corner construct
qa/qc construct EN ISO 9000 QUALITY SYSTEM CONSTRUCTION OF CHEMICAL OIL/GAS AND PETROCHEMICAL/ POWER PROJECTS qa/qc construct
THE QUALITY LIVES ON LONG AFTER THE PRICE
spacer
ISO 9001:2000 QUALITY MANAGEMENT SYSTEMS IN THE FAST TRACK (EPC) ENGINEEER, PROCUREMENT & CONSTRUCTION PROJECTS
QUALITY PLANNING PREVENTS PATHETIC PERFORMANCE
qa/qc construct qa/qc construct qa/qc construct qa/qc construct qa/qc construct
Quality Assurance Quality Control www.qaqc-construction.com



Construction Photos
Upload free your Project Photos.




The Ozone Hole
Planet Earth 1999
Safeguard Our Environment
Use ISO 14001





Black oil is going green, use it carefully!

Greenpeace

CLICK for QA/QC Stickers

QA\QC stickers

CLICK for QA\QC Screensaver

QA\QC Screensaver

spacer
spacer spacer spacer
  What is Constructability?  
 
Introduction spacer Constructability is a ways and means to improve quality and cost effectiveness. If you can control things by numbers you can reduce the cost. The weaknesses in most construction projects is that their is a big investment in construction and not in design. The project management must identify weakness and take action to balance weakness against strengths.
spacer
What is Going Against you Reluctance to invest additional money and effort in the early design phase
  • Lump sum competitive tendering limitations
  • Lack of on site construction experience in the design department
  • Construction personnel arriving late on site to assist the design department in preventing problems before they happen
  • Poor communication skills between the design and construction departments
Get It Right First Time The success of the Project depends on how people get on together and how management supports the team members to accomplish a common goal. (Individuals corroborating in order to accomplish a common goal)
The team members should be able to have
  • Clear roles and responsibilities
  • Mutual respect
  • Definition of targets
  • Clear objectives
  • Good leadership
  • Good communication skills
  • Recognition of stress
  • Unified goals
  • Appropriate authority
  • Shared responsibility
Insanity Doing things that you have always done then expecting the same results
spacer
Risk The higher the level of trust the higher the level is the success of the project.
The project team must identify
  • Risk control
  • Use a structure for risk management
  • Develope risk checklists
  • Identify risks in the project planning stage
 
spacer spacer spacer
© QA/QC Construction 1585466 pages requested
© Dr Mobeus Webscaping Friday 30 July 2010
American Express Visa Delta [1258 bytes] Visa [1251 bytes] MasterCard [1192 bytes]
corner construct blank construction corner construct

Oil And Gas The Project Overview QA\QC Systems Quality Services QA/QC Photo Gallery Library Tell Me A Story Design Variations Shop ISO9000

© 1998 - 2010 Copyright. All rights reserved