QA/QC Methodology Overview

1. Material Evaluation and Approvals
spacer
  • Supplier
  • Mix designs & Trail Mixes
  • Rebars & accessories
  • Embedments
vertline
2. Inspection
spacer
  • Survey & verification
  • Compaction testing (foundations)
vertline
3. Erection
spacer
  • Forms
  • Rebars
  • Embedments
  • Accessories
vertline
4. Inspection
spacer
  • Pre- Concrete inspection
  • Survey report
  • Compaction test report
  • Complete inspection check list
vertline
5. Concrete Pour Inspection
spacer
  • Trip ticket verification
  • Slump Test
  • Temperature check
  • Cylinder sampling & casting
vertline
6. Concrete Curing
spacer
  • Seven days wet curing
vertline
7. Compressive Testing
spacer
  • Three,seven and 28 days
    4.000 psi min on 28 days
vertline
8. Completion of The Work


Inspection Check Sheets

  C-01
C-02
C-03
C-04
C-05
C-06
C-07
C-08
C-09
C-10
C-11
vertline TRIAL MIX OF CONCRETE
COMPRESSIVE STRENGTH TEST OF CONCRETE
RECORD OF ANCHOR BOLT FOR STEEL STRUCTURE
CONTRIAL MIX OF CONCRETE
TANK FOUNDATION RECORD
EARTH & CONCRETE WORK FOUNDATION
PROCTOR TEST
CONCRETE AGGREGATES
CABLE PULL PITS PRE POURING
CABLE PULL PITS POST POURING
INSPECTION OF REINFORCING BAR INSTALLATION
line